Engineering Work

Engineering work between Norwich and Ely on Saturday 16 August 2008

Start date 16/08/2008
End date 17/08/2008
Route Affected
Norwich, Wymondham, Attleborough, Thetford, Brandon, Ely & Cambridge, Liverpool Lime Street, Warrington Central, Manchester Piccadilly, Sheffield, Alfreton, Nottingham, Peterborough, Ely & Norwich
TOC(s) Affected East Midlands Trains, National Express East Anglia
Description

National Express East Anglia

Services between Norwich and Thetford will be replaced by buses .

 Journey time to be extended by 40 to 50 Minutes.

At Spooner Row the bus will pick up / drop off adjacently to the level crossing.

At Eccles Road the bus will pick up / drop off adjacently to the level crossing.

At Harling Road the bus will pick up / drop off adjacently to the level crossing.

East Midland Trains

 Services between Peterborough/Ely and Norwich are replaced by buses.

Journey times may be extended by up to 45 minutes.

Additional Maps
Service Alterations and Engineering Works index

QUICK JOURNEY PLANNER

From (station):

To (station):

Date:
calendar
Time:
More search options

LIVE DEPARTURES & ARRIVALS




Limit by:(optional)

Accessible version?