Skip to main content

Advertisement

Amended Heathrow Airport service until 07:40 on Sunday 1 September 

See all service disruptions

Engineering work details

Starts 01 Sep 2024 to 01 Sep 2024

Train operators affected

Route(s) affected

Between Heathrow Airport and London Paddington

Description

Engineering work is taking place overnight in the Ealing Broadway area, closing some lines.

Elizabeth line:

The last departure 00:07 Heathrow Airport to London Paddington will terminate at Ealing Broadway.

Until 07:40

Services to / from Heathrow Airport / Reading will start / terminate at Ealing Broadway.

You should use local London Underground stations between Ealing Broadway and London Paddington.

Heathrow Express:

London Paddington to Heathrow Airport Terminals 2 and 3 - Heathrow Airport Terminal 5:

Services will start up later than normal. For the rest of the day a normal service (every 15 minutes) will operate.

From London Paddington to Heathrow Terminal 5:

First train 07:40, then every 15 mins until 23:25.

(Additional shuttles will operate from Heathrow Terminals 2 and 3 to Heathrow Terminal 5 at 05:13 and every 15 minutes until 07:28, then 07:46).

From Heathrow Airport Terminal 5 to London Paddington:

First train 07:27, then every 15 mins until 23:57.

(Additional shuttles will operate from Heathrow Terminal 5 to Heathrow Terminals 2 and 3 at 05:12 and every 15 minutes until 07:12).

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

You can plan your journey on London Underground by using the Transport for London Journey Planner

Advertisement