Skip to main content

Advertisement

Amended services between London Paddington and Ealing Broadway late night Saturday 9 and Sunday 10 March 

See all service disruptions

Engineering work details

Starts 09 Mar 2024 to 10 Mar 2024

Route(s) affected

Elizabeth line between Abbey Wood and London Paddington / Maidenhead / Heathrow Terminal 4 & 5 / Reading

Great Western Railway between London Paddington and Reading / Didcot Parkway

Heathrow Express between London Paddington and Heathrow Terminal 2, 3 & 5

Description

Engineering work is taking place between Ealing Broadway and London Paddington, closing all lines. ​​​​​​​

Elizabeth line:

Until 07:40, trains between London Paddington and Heathrow Terminals / Reading will start / terminate at Ealing Broadway.

After 07:40:

  • Abbey Wood to Maidenhead service will run between Abbey Wood and Paddington Lower Level only.

  • Abbey Wood to Heathrow T4 will be reduced to 2 trains per hour.

  • Maidenhead, Burnham, Slough, Langley, West Drayton, Hanwell and Acton Main Line stations will have a reduced service of 2 trains per hour.

  • Hayes & Harlington, Southall and Ealing Broadway will be reduced to 6 trains per hour.

  • Acton Main Line, West Ealing and Hanwell will have no service.

  • Services to / from Reading will now call at Iver.

Great Western Railway:

Saturday:

  • The 23:45 Didcot Parkway to London Paddington will terminate Ealing Broadway.

You should use London Underground services between Ealing Broadway and Central London.

Sunday morning:

  • The 06:20 Reading to London Paddington will operate later than normal throughout.

  • The 06:38 London Paddington to Reading will start from Ealing Broadway.

You should use London Underground services between Ealing Broadway and Central London.

Sunday:

Trains to / from London Paddington will be retimed to depart up to 10 minutes earlier than usual. Services will also run to an amended timetable throughout the day.

Heathrow Express:

Services will start up later than normal. Then for much of the day trains will operate at a reduced frequency (every 30 minutes).

(Additional shuttle trains will operate at certain times of the day between Heathrow Terminals 2 & 3 and Heathrow Terminal 5).

Check before you travel: 

You can plan your journey using the National Rail Enquiries Journey Planner

Advertisement