Skip to main content

Advertisement

Amended Great Western Railway services between London Paddington and Reading on Sunday 2 June 

See all service disruptions

Engineering work details

Starts 02 Jun 2024 to 02 Jun 2024

Train operators affected

Route(s) affected

Great Western Railway between London Paddington and Reading / Didcot Parkway / Oxford / Swindon / Worcester Shrub Hill / Great Malvern / Bristol Parkway / Weston-super-Mare / Cheltenham Spa / Cardiff Central / Swansea / Exeter St Davids / Plymouth / Penzance

Description

Engineering work is taking place on 2 out of 4 tracks between London Paddington and Ealing Broadway, closing some lines.

High Speed services:

From London Paddington:

Most trains from London Paddington will have revised departure times.

Most trains from London Paddington to Swindon (a few beyond) will depart earlier and will call additionally at Slough, Maidenhead and Twyford.

Most trains from London Paddington to Oxford will not run.

Most trains to Worcester / Great Malvern / Hereford will not call at Radley. Additional trains will operate from Didcot Parkway and Radley to Oxford.

To London Paddington:

Trains to London Paddington will arrive London Paddington at revised times, most of them later than normal.

Most fast trains from Oxford to London Paddington will not run.

Most trains from Hereford / Great Malvern / Worcester to London Paddington will not call at Radley. Additional trains will operate from Oxford and Radley to Didcot Parkway.

Most fast trains from Swindon (a few from beyond) to London Paddington will call additionally at Twyford, Maidenhead and Slough. Some will operate in revised timings.

Local services:

For most of the day the hourly service between London Paddington and Didcot Parkway will operate between Reading and Didcot Parkway only.

Check before you travel:

You can plan your journey using the National Rail Enquiries Journey Planner

​​​​​​

Advertisement